15 Bon Accord Crescent
Aberdeen , AB11 6DE
Tel: + 44 (0)1224 213 440 (David Hughes)
Email:david.hughes@senergyltd.com
Web:www.senergyltd.com
Senergy Ltd provides an integrated resource for the oil and gas industry with the expertise and flexibility to meet every need from reservoir evaluation through to full field development and wells performance management. Senergy is now working for North Sea operators to design and evaluate CO2 enhanced oil recovery (EOR) projects. This includes the detailed subsurface planning and performance prediction of BP’s proposed project in the Miller field. Senergy’s geologists and engineers are also working with clients on the design of geological storage projects in depleted gas fields and saline aquifers. This includes the number and type of injection wells required and the long term security of the CO2. Senergy’s clients for this type of work include BP, Marathon, DTI, Centrica, Petronas, Statoil, Sonatrach and Petoro. For further information on Senergy’s capability in relation to CO2 EOR and geological storage please contact David Hughes at david.hughes@senergyltd.com or +44 1224 213440.
2008 CCSA © | Last Updated: Jan 2008

